Talnivo
Sujet de PFE

Project 3: Energy Performance Analysis of Battery Formation Lines

Shandong Xinxu Group

Type de contrat : Stage

Challenge How can electricity consumption at battery formation stations be measured and optimized? Project objective Develop an energy monitoring platform to measure the electricity consumption of each station and calculate the energy consumed per manufactured battery (kWh/battery). Main tasks

• Install electrical measurement devices.

• Collect and centralize energy consumption data.

• Monitor the energy consumption of each station.

• Calculate energy consumption per battery.

• Compare energy performance and detect anomalies.

Target profiles Electrical Engineering, Electromechanics, Automation and Industrial IT. Context Final-year project (PFE) internship topic for 2027 within Shandong Xinxu Group.

Source : Hi Talents (hi-talents.com)

📄 Générer Convention de Stage

Talnivo calcule votre score de compatibilité CV ↔ offre et vous aide à l'améliorer avant de postuler.

Créer un compte gratuit